Under the Drilldown chevron we present the list of capabilities in the form of Tiles - that show the capability number, name and the count of change activities.
Some of our canvas categories may lead to 50+ capabilities being identified and so we have included a new feature to toggle the capability view from a tile view to a list view.
To the left of the Capabilities - Sub Goals matrix button on the RHS of the drilldown screen we have an icon:

This button allows you to toggle the view from Tiles to List. On the list view we have the ability to sort the lists by columns. We have added two additional columns: Capabilities Group and Impact.
On the Capability screen we have added a new button Capabilities Groups where you can define a number of groups that you wish to use (if needed) to group the capabilities under. This is particularly useful if you have many of them.
Then on the Capability Screen itself, there are 2 new fields next to the capability name: Group and Impact. Each of these has a drop down from which you can assign the capability under, and these selections will appear on the List view of all capabilities and can be used to sort them under.
From a usage perspective, you may find that you wish to use a numerical prefix in front of the capability name so that, when sorted they appear in a desired order - potentially matching to a corporate reference model.
We have provided an additional feature when designing each capability with the Design Table under the Capabilities Design Section.
There is a new slider button that shows tow values ‘Text Areas’ and ‘Design Table’. The text areas provide three text boxes that allow a free form text to define the three components of the capability - People, Process and Technology and allow a general narrative to be captured.
In addition to these narratives, the Design Table provides a 3-column grid with a single empty row to start that you can use to structure rows of design statements aligning statements made for each of the columns.
For example, where the canvas category is the new Change Management Plan we use the term ‘Impacted Processes’ instead of Capabilities and capture these processes at Level 3 details.
The Design Table for each level 3 process is used to Capture the Role, Activity and Change Impact for each Activity below the level 3 - in effect the work steps needed to perform the Level 3 process.
Additional rows can be added to the Design Table as required.
When the Canvas is extracted in Excel format, the rows of the Design table are extracted individually. The resulting data can be manipulated through Excel filters and pivot tables.